HDB PACKAGE FOR 5 ROOM DEMOLION WORK. SCOPE OF WORKS INCLUDE....
BATHROOM WORK
- HACKING OF WALL AND FLOOR TILE FOR 2 BATHROOM
- DISMANTLE AND DISPOSE EXISTING WC, VANITY AND BATHROOM ACCESSORIES FOR 2 BATHROOMS
KITCHEN WORKS
-HACKING OF WALL AND FLOOR TILE @ KITCHEN AREA
-DISMANTLE EXISTING KITCHEN TOP AND BOTTOM CABINET
LIVING ROOM WORKS
- HACKING OF FLOOR TILES AND SKIRTING @ LIVING ROOM OR
- DISMANTLING OF EXISTING VINYL FLOORING @ LIVING ROOM
- DISMANTLING OF EXISTING BUILT IN SHOE CABINET
MASTER BEDROOM WORKS
-HACKING OF FLOOR TILES @ MASTER BEDROOM OR
-DISMANTLING OF EXISTING VINYL FLOORING @MASTERBEDROOM
-DISMANTLING OF EXISTING BUILT IN WARDROBE
-BEDROOM 1 WORKS
-HACKING OF FLOOR TILES @ BEDROOM 1 OR
-DISMANTLING OF EXISTING VINYL FLOORING @BEDROOM 1
-DISMANTLING OF EXISTING BUILT IN WARDROBE
-BEDROOM 2 WORKS
-HACKING OF FLOOR TILES @ BEDROOM 1 OR
-DISMANTLING OF EXISTING VINYL FLOORING @BEDROOM 1
-DISMANTLING OF EXISTING BUILT IN WARDROBE
-BEDROOM 3 WORKS
-HACKING OF FLOOR TILES @ BEDROOM 1 OR
-DISMANTLING OF EXISTING VINYL FLOORING @BEDROOM 1
-DISMANTLING OF EXISTING BUILT IN WARDROBE
-STUDYROOM WORKS
-HACKING OF FLOOR TILES @ BEDROOM 1 OR
-DISMANTLING OF EXISTING VINYL FLOORING @BEDROOM 1
-DISMANTLING OF EXISTING BUILT IN WARDROBE
HAULAGE OF MATERIALS
- UPLIFT OF RAW MATERIAL TO THE UNIT
RUBBISH DISPOSAL
- DISPOSAL OF DEBRIS AND RUBBISH X 3 TRIPS
OTHER ITEM THAT IS NOT LISTED IN THE PACKAGE WILL BE SEPERATE COSTING.